Successfully carried out exploration and drilling operations in stages between 2009 and 2021. The geological report on the distinguished ore bodies I, II, III, IV and V within the northeast body of the central deposit of Bayangol Iron Ore Deposit were prepared in 2011 and 2021 at the meeting of the Mineral Resources Professional Council and were subsequently approved.
Currently, the necessary mining machinery and equipment such as – PC3000-6, PC1250-8, HD785-7, TEREX-100, WA600-6, D275-6R – of Komatsu brand have been integrated for operational sue within the mine.